Measuring and inspection systems for the curing area

Curing area

First tire check and systematic tire check are the last step of the tire pressing process. Checking the correctness, completeness and quality of the text from the tire bead, through the rim protector to the sidewall of the tire is a necessary step to ensure production in accordance with the law and at the same time in accordance with quality requirements.

Checking the correctness of the tread pattern as well as the inner part of the tire tread becomes an integral part of the first tire check and systematic tire check. This ensures that every tire meets the highest quality standards before it leaves the production process.

logo

Fields of application

  • Letter inspection
Your request for: {product}
* 필수 항목
당사는 개인 정보 보호를 최우선으로 생각합니다. 자세한 내용은 개인정보처리방침 을 참고하시기 바랍니다.

다운로드

카탈로그 및 데이터시트